St. John's College, Marlborough for ISG Pearce

For St John's School in Marlborough, Structural Systems provided a site team of engineers and steel erectors & a fully co-ordinated SFS package from initial design to completion on site.

The overall project for ISG Pearce included the construction of five blocks interlinked with walkways, a new entrance road and coach park, the re-profiling of the existing playing fields to a Sport England standard and the supply of temporary classrooms for the duration of the project.
The external envelope is a mixture of steel cladding, insulated render and timber weather boarding on a frame system incorporating composite windows and curtain walling.

The project used 77.1 tonne of steel, a total of 17,500 metres of cee section, together with all support bracketry and necessary hot rolled steel fabricated in Structural Systems Ltd works.

Click on the pictures for a larger image.

Marlborough | Click to en-large  Marlborough | Click to en-large  Marlborough | Click to en-large  <h1>St. John's College, Marlborough for ISG Pearce</h1>

St. John's College, Marlborough for ISG Pearce  St. John's College, Marlborough for ISG Pearce  St. John's College, Marlborough for ISG Pearce  St. John's College, Marlborough for ISG Pearce

St. John's College, Marlborough for ISG Pearce  St. John's College, Marlborough for ISG Pearce

Home > Past Projects Gallery > Structural Framing Systems
Structural Systems Ltd Unit 16, Ground Floor Londonderry Farm, Keynsham Road, Willsbridge, Bristol, BS30 6EL | T: 0117 914 9961